Alluvial Gold Washing Trommel Screen Machine Placer Gold Recovery Machine Alluvial Gold Mining Equipment
1.Introduction of Alluvial Gold Mining Equipment:
The mobile gold trommel is a kind of gold equipment which can be moved on land, it is composed by hopper, trommel, chassis, tires, turntable, generator, water pump, gearing, control panel and gold sluice box
. It has the characteristics of compact structure, strong integrity, light weight, large handling capacity, simple operation, reliable operation, easy maintenance and convenient operation.We has been exported to Sudan, Africa,North Korea, Tanzania, Ghana etc.
The main structure of the GTS trommel gold wash plant is a screening cylinder, which is composed of several circular meshes and also inclined with the ground. Outside is sealed by the sealing guard to prevent environmental pollution. Through variable speed deceleration system, the screening cylinder is rotated at a certain rotation speed, and the material is separated from the top to the bottom through the screening cylinder, the fine material is discharged from the lower part of the front end of the screening cylinder. The drum screen can be provided with a comb-shaped cleaning mechanism, and the relative movement of the comb-shaped cleaning mechanism and the screening cylinder can be achieved the effect of cleaning the sieve body without ant interruption during the screening process, so that the sieve and the splitting cylinder is always clear and does not affect the screening effect throughout the working process.
2.Application of Alluvial Gold Mining Equipment:
Gold trommel screen is usually used at the primary separation period of placer gold mining so as to washing and screening the gold ore. The upper sizes out are always reckoned as unuseful materials. The bottom sizes which contain the gold are usually processed by centrifugal concentrator or gold sluice box continuously to upgrade the gold ore. The concentrates of centrifugal concentrator could be processed by shaking table which is used to separate the gold from other minerals.
3.Main Characteristics:
· Configured for economical & efficient classification, Screening and grading.
· Heavy duty trommel drum with lifters at the front to facilitate material break up.
· Screen replaceable for different mesh sizes.
· Multiple screen size
· Easily changed screen plates
· Largest processing capacity in the industry
· Unique screen design, result in higher capacities, longer screen life and no material clogging
· Heavy duty feed hopper and extension
· Discharge chute
· Gear drive mechanism
· Variable speed drive mechanism
4.Working Principle Alluvial Gold Mining Equipment:
Material feed into the hopper by excavator,high pressure water released and wash the mineral,then,mineral by forward into the drum.It is lifted up by the rotation and aerated as it fall back down.This finer material passes through the screen openings while the large material tumbles towards its eventually exit at the real of the drum.After that,the final mineral and water go through the sluice bow which is consist with gold grass mat.The no use mineral are washed out and the gold are catched by the gold slucie box.
5.Technical Parameter List of Alluvial Gold Mining Equipment:
Mobile Gold Trommel Screen |
Model |
Screen Specification
(mm) |
Capacity
(t/h) |
Motor Power
(kw) |
Dimensions
(mm) |
Sluice Box Size
L*W (mm) |
GTS10 |
800*1500 |
5-10 |
11 |
2500*1000 |
2000*500 |
GTS30 |
1200*2500 |
30 |
35 |
5000*1400 |
3000*1000 |
GTS50 |
1500*3000 |
50 |
50 |
6500*1800 |
4500*1000 |
GTS100 |
1500*4500 |
100 |
100 |
8300*2200 |
6000*1000 |
GTS150 |
1600*4800 |
150 |
120 |
9200*2200 |
2*(6000*1000) |
GTS200 |
1800*5000 |
200 |
150 |
11500*2250 |
2*(6000*1000) |
Gold Centrifugal Concentrator |
Model |
Feeding size
(mm) |
Capacity
(t/h) |
Motor Power
(kw) |
Weight
(kg) |
Dimensions
(mm) |
STL-30 |
0-4 |
5-10 |
1.5 |
750 |
1180x1140x1250 |
STL-60 |
0-6 |
30-50 |
5.5 |
1700 |
1970x1670x1750 |
STL-80 |
0-6 |
40-60 |
11 |
2300 |
2300x1800x2200 |
STL-100 |
0-6 |
80-100 |
18.5 |
3500 |
2500x2000x2400 |
6.Related Products:
7.Successful case:
8.Packing & Delivery:
9. About our factory:
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.
We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten,lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile,diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal,precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia,Vietnam,Korea,Mongolia and other countries.
10. Our service:
1.Pre-sale services:
(1)Select equipment model;
(2) Design and manufactLire products according to clients' special requirement;
(3)Train technical personnel for dients.
2.Services during the sale:
(1) Pre-check and accept products ahead of delivery;
(2)help clients to draft solving plans.
3. After-sale services:
(1) Assist dients to prepare for the first construction scheme;
(2)Install and debug the equipment;
(3) Train the first-line operators on site;
11. FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.not dealer.Direct factory sale makes price more competitive.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: