Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph

Product Details
Customization: Available
Type: Ball Mill
Motor Type: AC Motor
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (17)
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
  • Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Find Similar Products

Basic Info.

Model NO.
gold ball mill 0918
Motor Power
11kw
Rotationl Speed
41.6 R/Min
Application
Mine
Materials
All Kinds of Minerals
Condition
New
Warranty
1 Year
After-sales Service
Online Support
Product Name
Ball Mill
Usage
Grinding All Kinds of Rock Minerals
Model
GM0918
Capacity
0.4-1.2 Tph
Power
11 Kw
Liners Materials
High Manganese Steel
Feeding Size
25mm
Matching Machinery
Spiral Classifier
Loading Steel Balls
1.5 Tons
Ball Mill Weight
4210kg
Keywords
Gold Ball Mill, Gold Stone Grinding Mill
Related Machines
Jaw Crusher, Hammer Mill, Shaking Tables
Color
Customized
Installation Size
4.5X1.85X1.4 Cbm
Lead Time
20 Days
Transport Package
Shipping Container
Specification
4210 tons
Trademark
Hengchang
Origin
China
HS Code
8474202000
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
4.50cm * 1.80cm * 1.40cm
Package Gross Weight
5800.000kg

Product Description

Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill For 1-2 TPH

~Note~
We are a 25+ year factory for
making crushers, grindings, gravity separators and flotation machines
and also mining washing and screening machines.
 
The price and specification on this page are just for reference.
contact our staff for getting more details.
We will give you more competitive price and suitable solutions.

 
1. Ball mill 018 Introduce
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
[Usage] Grinding stones rocks with water or no water
 
[Application]  Mining, cement, making sand
 
[Type of grinding] Wet and Dry grinding are accepted.
 
[Main part] Motor, reducer, belts, drum, liners
 
[Grinding medium] Steel balls, steel bars
 
[Operation]Continuously feeding and discharging
 
[specification] 0.4-1.2 TPH capacity, feeding size <25mm, output size: 2mm-0.074mm, power: 15KW. Motor: 380V, 50Hz

2. Other Small Ball Mill models
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
            900x900 rock gold ball mill for 500KG-1ton per hour                                        400x600 rock gold ball mill for 200kg-500kg per hour
Model
Revolution
Balls
Max size
Capacity
Power
Dimension
Weight
r/min
t
mm
t/h
kw
(LxWxH)mm
kg
GM0912
41.6
1.1
25
0.3-0.9
11
3843*1850*1400
4210
GM0921
41.6
1.8
25
0.6-1.5
15
4743*1850*1400
6660
GM0933
41.6
2.8
25
0.9-2.3
30
5943*1850*1400
7770
GM1224
35.1
4.0
25
1.6-4.1
37
5540*2300*1850
10020
GM1232
35.1
5.3
25
2.2-5.5
45
6340*2300*1850
11230
GM1244
35.1
7.3
25
3.0-7.5
55
7540*2300*1850
13210
GM1324
30.2
4.5
25
1.5-3.5
37
5035*2370*1880
10210
GM1334
30.2
6.5
25
2.2-5.0
75
6035*2370*1880
13117
GM1524
30.7
7.0
25
2.8-6.5
55
6830*2930*2060
15430
GM1530
30.7
9.0
25
3.5-8.0
80
7430*2930*2060
16843
GM1536
30.7
11.0
25
4.5-10.0
95
8030*2930*2060
18649
GM1545
30.7
13.5
25
5.5-13.5
110
8930*2930*2060
20000
GM1830
25.04
13.0
25
3.0-17.0
130
9525*3960*2250
29490
GM1836
25.04
15.0
25
4.0-21.5
155
10125*3960*2250
31600
GM1844
25.04
19.0
25
5.2-26.0
180
10925*3960*2250
34210
GM1864
25.04
27.0
25
8.0-40.0
210
12925*3960*2250
42440
GM2130
23.8
20.0
25
4.0-30.0
180
8475*4060*3400
41965
GM2145
23.8
25.0
25
5.6-42.0
280
9975*4060*3400
49230
GM3245
18.7
65.0
25
100-145
630
13000*7200*5700
145000

3. Ball mill Wear parts
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
               High manganese steel                                                         Steel Balls

The ball mill is suitable for all ore dressing and milling operations, including flotation, cyanidation, and gravity concentration.

The working principle is to Crush and Grind, often with rob mill and ball mills, the ore in order to liberate the minerals

In the chemical and process industries, grinding is an important step in preparing raw materials for subsequent treatment.

In present-day practice, the ore is reduced to a size many times finer than can be obtained with crushers. over a period of many years, various fine grinding machines have been developed and used, but the ball mill has become standard due to its simplicity and low operating cost.
ball

4. Ball mill Application
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Rock gold processing line
Our equipment is best used in small-scale extractive metallurgy operations operated by small miners or hobbyist prospectors and mining fanatics. We offer gold mining equipment as well as processing equipment applicable to most any base metals: copper, lead, zinc, nickel, tin, tungsten, and more. machines include crushers, mills, ball mills, and shakers.







 

5. Ball Mill Successful Case
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph

6. Ball mill in our factory
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph

7.Making Ball Mill
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
8. About Our Factory
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located on No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in mineral processing equipment research, development, design, and production for many years history has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up a good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten, and lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile, diamonds, other precious metals, and precious metals mine, and for the flotation colored black metal, precious metals, and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia, Vietnam, Korea, Mongolia, and other countries.
Mining Equipment Durable and Wearable Small Wet Grinding Mill Gold Ball Mill 0918 Ball Mill for 1-2 Tph
9. FAQ
1. How long has Hengchang been in business?

Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold
/coltan/tin/tungsten mining equipment

2. How long is the warranty period?

The warranty for the main machine is 12 months. we also supply spare parts to customers.

3. What is the Salary of an engineer?
150 USD Per day, the air ticket, and accommodation should be borne by the customer.

4. Where is the Hengchang factory located?
how about the transportation? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly fly to Guangzhou, Shanghai, Shenzhen, and Beijing.

5. What is the leading time?
For shaking table and laboratory mining equipment, we can send it out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.

6. What is the nearest Sea port?
Xiamen Port, Guangzhou Port, Shenzhen Port

7. What are the trade terms?
CIF, FOB ect is acceptable.

8. What do normal mining procedures include?

A. Sampling and analysis of the sample. take enough samples from different locations and depths, analyze the size distribution and
element.

B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and
mining area. the engineer will consider the plant location and process flow.

C. Separation test. take samples to do a separation test based on the process flow in stage Two.

D. Based on the result of testing, adjust the process flow if necessary.

E. Determine the capacity of the plant based on the quotation of the plant and estimated output.

F. Place order and equipment production.

G. Plant design. ground clearance and basement building according to the design.

H. Plant installation and testing production.

I. Training and debugging.

9. What Information should customers give to us?

In order to let we provide you with efficient & suitable quotation and assistance.

1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone, What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4). What are the elements of the raw ore? How much percent % of each mineral?
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now