• Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
  • Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
  • Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
  • Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
  • Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
  • Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Type: Gold Mill
Motor Type: AC Motor
Motor Power: 5.5KW
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill pictures & photos
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
US $3,900-4,250 / Set
Min. Order: 5 Sets
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Secured Trading Service
Jiangxi, China
Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 10 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
to see all verified strength labels (17)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Successfully Case
  • Packaging & Shipping
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
1200B
Rotationl Speed
16-18r/min
Application
Mine
Materials
Gold
Condition
New
Product Name
Wet Pan Mill
Capacity
0.8-1.2 T/H
Main Products
Gold Mining Equipment
MOQ
1 Set
Power
5.5 Kw
Weight
5500 Kg
Color
as Your Request
Certification
ISO, CE, etc
Advantages
Professional Manufacturer
Transport Package
FCL or LCL
Specification
1200*220*80*250 mm
Trademark
Hengchang
Origin
Jiangxi, China
HS Code
8474202000
Production Capacity
100sets/Month

Product Description

Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Product Description

1.Wet Pan Mill Introduction:
Wet pan mill also called gold round mill, it is versatile ore grinding equipment not only for grinding the minerals but also for gold amalgam. It is a best replacement for medium-small capacity ball mill, owing to the excellent performance for wet crushing, small investment and high output. 

2.Wet Pan Mill Characteristics:
1. Uniform grinding, high quality finished product.
2. Make full use of resources, energy efficient.
3.
Stable operation and reliable quality.
4. Low energy consumption, silent, safe operation.

3.Wet Pan Mill Working Principle:
Wet pan mill adopts the working mode of the wheel-type grinding: firstly, the electric motor drives the power to the speed reducer, and the torque is transmitted to the upper horizontal shaft through the large vertical shaft driven by the speed reducer. Then, the tie rods installed at both ends of the horizontal axis are transmitted to the grinding wheel, so that the grinding wheel generates driving force, and the counterclockwise rotation motion is performed along the horizontal direction of the horizontal axis. The working wheel can not only revolve around the large vertical axis of the wet mill, but also rotate around the central axis of the roller, and the grinding disc is fixed. The added ore material is subjected to the pressing force from the weight of the drum itself in the mill. When the roller rotates and rotates, the huge friction generated by the grinding disc is completely crushed after repeated extrusion, smashing and grinding.

4.Wet Pan Mill Structure:


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill


5.Wet Pan Mill Applications:
It is widely applied to the grinding and beneficiation of all kinds of metal minerals, non-metal minerals, rare metal and other materials. Such as gold, silver, lead, zinc, molybdenum, iron, copper, antimony, tungsten, tin and so on. 

Detailed Photos


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Product Parameters

Model Feeding size
(mm)
Output size
(mm)
Capacity
(t/h)
Speed
(r/min)
Motor power
(kw)
Weight
(kg)
900 <15 0.6-0.07 0.3 17-19 5.5 3000
1000 <20 0.6-0.07 0.5 16-18 5.5 4500
1100 <20 0.6-0.07 0.6-0.8 16-18 7.5 5000
1200B <20 0.6-0.07 0.8-1.2 16-18 7.5 5500
1200A <20 0.6-0.07 1-1.3 21-23 7.5 5500
1300 <20 0.6-0.07 1.5 16-18 15 7500
1400 <20 0.6-0.07 1.5-2 16-18 18.5 8500
1500B <30 0.6-0.07 2.5-3 20-22 22 12300
1500A <30 0.6-0.07 3-4 20-22 22 13300
1600 <30 0.6-0.07 4-5 20-22 30 14500

Successfully Case


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Packaging & Shipping


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Company Profile

Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road, Guzhang Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province, China.

Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table, Flotation equipment, Crushing equipment, Magnetic separator, Screening equipment, Classifying equipment, Agitation tank, Feeding equipment, Gravity separation equipment, Wet separation equipment, Spiral chute, Saw-tooth wave jig and Diaphragm Jig, Grinding equipment, Ball mill, Slurry pump, Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten, lead, zinc, tin, molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile, diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal, precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil, India, Indonesia,South Africa, Somalia, Philippines, Malaysia, Sudan, Nigeria, Russia, Ghana, Kazakhstan, Kyrgyzstan, Cambodia, Vietnam, Korea, Mongolia, Myanmar and other countries.


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

Certifications


Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill

FAQ

1. How long has Hengchang been in business?
Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold/coltan/tin/tungsten mining equipment

2. How long is the warranty period?
The warranty for the main machine is 12 month, we also supply spare parts to customer.

3. What is the Salary of engineer?
100-120 USD per day, the air ticket, accommodation, should be beared by customer.

4. Where is Hengchang factory located?
how about the transportation? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly flight to Guangzhou, Shanghai, Shenzhen, Beijing.

5. What is the leading time?
For shaking table and laboratory mining equipment ,we can send out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.

6. What is the nearest Sea port?
Xiamen Port, Guangzhou Port, Shenzhen Port

7. What is the trade terms?
CIF,FOB ect is acceptable.

8. What normal mining procedures including?
A. Sampling and analysis of the sample. take enough sample from different location and depth, analysis the size distribution and
element.
B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and mining area. the engineer will consider the plant location and process flow.
C. Separation test. take samples to do separation test based on the process flow on stage Two.
D. Based on the result of testing, adjust the process flow if necessary.
E. Determine the capacity of the plant based on the quotation of plant and estimated output.
F. Place order and equipment production.
G. Plant design. ground clearance and basement building according to the design.
H. Plant installation and testing production.
I. Training and debugging.

9. What information should customers give to us?
In order to let we provide you with efficient & suitable quotation and assistance.

1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent of each minerals?

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill pictures & photos
Gold Mining Equipment 1 Ton Per Hour Gold Ore Grinding Machines Stone Mill Machine Roller Wet Pan Mill
US $3,900-4,250 / Set
Min. Order: 5 Sets
Diamond Member Since 2016

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
80
Year of Establishment
2005-12-09